Solar Installation Project For 'Here Studios'

At NSI Projects, we’re passionate about harnessing the power of renewable energy to drive sustainability and cost savings for our clients. Our recent solar PV installation project at Here Studios in Bristol exemplifies our commitment to delivering innovative solutions in the face of challenges. Let’s delve into the details of this exciting venture.

Project Overview: Here Studios, a multi-tenanted office complex in Bristol, was facing exorbitant electricity costs, with an annual consumption of over 1 million kWh at a steep rate of £0.72/kWh. To address this issue and reduce carbon emissions, NSI Projects undertook the task of installing a solar PV system on the studio’s roof.

Key Project Highlights:

  • Solar Generation: Utilising the maximum roof area available, NSI Projects installed 212 high-performance PV modules, generating 90,614 kWh of solar energy annually.
  • Environmental Impact: The project’s environmental benefits are substantial, with a carbon emissions saving of 21 tonnes, equivalent to planting 950 mature trees.
  • Financial Savings: Over a 25-year period, the predicted savings from solar energy amount to an impressive £2,500,000, demonstrating the long-term financial viability of renewable energy investments.
  • Premium Performance: Despite challenges such as limited ground space and complex cable runs, NSI Projects delivered a premium performance solar system that meets the studio’s energy needs efficiently.

Challenges Faced: The project encountered several challenges, including the multi-tenanted nature of the offices, limited ground space for material delivery, and the location of the plant room for inverter installation. However, NSI Projects’ expertise and innovative solutions overcame these obstacles, ensuring the successful completion of the installation.

The Here Studios solar PV installation project stands as a testament to NSI Projects’ dedication to sustainability, innovation, and client satisfaction. By harnessing the power of solar energy, we’ve not only significantly reduced the studio’s carbon footprint but also provided substantial cost savings over the long term. As we continue to pioneer renewable energy solutions, we remain committed to shaping a greener and more sustainable future for all.

Stay tuned for more updates on our latest projects and innovations in renewable energy!

 

 

Why Use NSI Projects?

NSI Projects have over 40 years of experience in delivering great projects for commercial buildings. We partner with leading suppliers and experts to design, procure and install practical and cost effective solutions for our customers.

 

Call our experts today on 0800 027 1966.

Huboo warehouse exterior

Testimonials

More Good stored inside due to a new mezzanine floor

Huboo.

The team at NSI Projects provided a complete design and build service to Huboo for this project, taking time to understand our requirements and turning the design into reality. They provided trusted advice and safe project management, allowing us to get on with our daily operations knowing that the installation was under control.

Billy Ansell - Facilities Manager
Industrial pallet racking systems

Ribble Technologies.

We received top notch service from Alex Gallagher and the team with the install of our racking, couldn't recommend NSI enough! Nothing was too much trouble, amazing customer and installation service from start to finish.

Emma Cook - Office Manager
Bulk Powders automated pallet racking system

Bulk Powders.

On behalf of Bulk Powders, NSI Projects designed, procured and managed the installation of the automated pallet shuttle system from start to completion, the site was managed so that the installation and ongoing operations could exist side by side.

Guy Martin - Project Consultant

DHL Stirling Park large racking project

DHL Stirling Park.

I wanted to take a moment to express my sincere gratitude for the outstanding job your team did on our recent warehouse project. The changes and installation of the new racking was executed flawlessly and within budget, which is a testament to your team’s expertise and professionalism. Their attention to detail, commitment to quality workmanship, and ability to keep everything on track were truly impressive. They went above and beyond in ensuring that all aspects of the project were completed satisfactorily.

Andrius Cekanauskas - Senior Planning Manager DHL Manufacturing Logistics
Euro Options server room created with dividing walls

Euro Options.

We love the job NSI Projects have done, they worked efficiently and completed the job above our expectations.

Ian Tait - Commercial Manager Euro Options
Arial shot of a warehouse with soalr panels installed

John Scott Works.

A big thank you to NSI Projects for providing us with a quick and quality service.

Matthijis Schot - CEO PRN Group