  1. Q – Is Building Control required for a Mezzanine Platform?
    A – Yes, can either be done by customer, or we can apply for this on their behalf.  
  2. Q - If I order a mezzanine floor or pallet racking system, how long until I can have it installed/operational? 
    A - There are no set lead times, however, orders are generally processed as follows:

 

  • NSI receive your order.  
  • We will arrange a detailed site survey (usually within a few days of receiving your order)  
  • A detailed structural drawing is produced within a few days of site survey and passed to you for approval.  
  • Once drawing approval has been received by NSI we will advise our soonest possible installation date.  
  • This can be anything from two to five weeks (information correct at time of writing) depending on size & complexity of installation.  
  • We will also advise you on the expected duration of the installation to allow you to plan your day-to-day operations with as little lost time as possible.

 